Deck Cost Calculator

Deck Cost Calculator

Plan with measured dimensions and editable assumptions. Preset prices, regional factors and replacement intervals are illustrative scenarios, not current quotes, warranties or predicted service life.

Deck Dimensions

Decking Material

Options

Editable scenario assumptions

Blank optional overrides use the selected preset. Other fields are required; zero costs are allowed. Decking and replacement-interval overrides apply only to the selected material; other comparisons use their stated presets.

Pattern factors, fastener add-ons, features and regional multipliers remain illustrative presets. Each selected lighting option adds its displayed amount once; it is not a count of fixtures.

Region & Labor

Estimated Cost

$8,614

192 sq ft · $44.86/sf

Decking$672
Framing$768
Railing$1,400
Stairs$1,200
Labor$4,224
Permit$350
25-Year Scenario$14,086

Cost Breakdown

$0.0k$1.5k$3.0k$4.5k$6.0kDeckingFramingRailingStairsLaborPermit

25-Year Planning Scenario

PT PineCedarRedwoodDouglas FirCypressBudget CompositeMid-Range CompositePremium CompositePVC DeckingIpeCumaruTigerwoodGarapaMahoganyAluminumBambooThermo-Modified$0k$5k$9k$14k$18k

Material Comparison

Material$/sfAssumed intervalAnnual $/sf25yr scenario $/sf
PT Pine$3.5015 yrs$1.00/sf$73.36
Cedar$6.0020 yrs$1.00/sf$78.36
Redwood$8.0025 yrs$1.00/sf$74.36
Douglas Fir$4.5015 yrs$1.00/sf$75.36
Cypress$5.5020 yrs$1.00/sf$77.36
Budget Composite$5.0025 yrs$1.00/sf$71.36
Mid-Range Composite$8.0030 yrs$1.00/sf$74.36
Premium Composite$12.0040 yrs$1.00/sf$78.36
PVC Decking$11.0035 yrs$1.00/sf$77.36
Ipe$20.0050 yrs$1.00/sf$86.36
Cumaru$14.0040 yrs$1.00/sf$80.36
Tigerwood$12.0035 yrs$1.00/sf$78.36
Garapa$10.0030 yrs$1.00/sf$76.36
Mahogany$12.0030 yrs$1.00/sf$78.36
Aluminum$15.0050 yrs$1.00/sf$81.36
Bamboo$7.0025 yrs$1.00/sf$73.36
Thermo-Modified$9.0030 yrs$1.00/sf$75.36

Every comparison includes the same geometry, initial framing, railing, stairs, selected extras, labor and permit assumptions. Over 25 years the model adds annual maintenance and replacement decking plus fasteners at the assumed interval, strictly before year 25. Replacement labor, demolition, disposal, framing/railing replacement, tax, delivery, inflation and financing are excluded. This is a partial planning scenario, not a full ownership-cost forecast.

Planning checks

1.Use measured area and actual railing runs.

2.Replace illustrative rates with itemized quotes.

3.Confirm which components, labor and delivery charges each quote includes.