Deck Cost Calculator
Deck Cost Calculator
Plan with measured dimensions and editable assumptions. Preset prices, regional factors and replacement intervals are illustrative scenarios, not current quotes, warranties or predicted service life.
Deck Dimensions
Decking Material
Options
Editable scenario assumptions
Blank optional overrides use the selected preset. Other fields are required; zero costs are allowed. Decking and replacement-interval overrides apply only to the selected material; other comparisons use their stated presets.
Pattern factors, fastener add-ons, features and regional multipliers remain illustrative presets. Each selected lighting option adds its displayed amount once; it is not a count of fixtures.
Region & Labor
Cost Breakdown
25-Year Planning Scenario
Material Comparison
| Material | $/sf | Assumed interval | Annual $/sf | 25yr scenario $/sf |
|---|---|---|---|---|
| PT Pine | $3.50 | 15 yrs | $1.00/sf | $73.36 |
| Cedar | $6.00 | 20 yrs | $1.00/sf | $78.36 |
| Redwood | $8.00 | 25 yrs | $1.00/sf | $74.36 |
| Douglas Fir | $4.50 | 15 yrs | $1.00/sf | $75.36 |
| Cypress | $5.50 | 20 yrs | $1.00/sf | $77.36 |
| Budget Composite | $5.00 | 25 yrs | $1.00/sf | $71.36 |
| Mid-Range Composite | $8.00 | 30 yrs | $1.00/sf | $74.36 |
| Premium Composite | $12.00 | 40 yrs | $1.00/sf | $78.36 |
| PVC Decking | $11.00 | 35 yrs | $1.00/sf | $77.36 |
| Ipe | $20.00 | 50 yrs | $1.00/sf | $86.36 |
| Cumaru | $14.00 | 40 yrs | $1.00/sf | $80.36 |
| Tigerwood | $12.00 | 35 yrs | $1.00/sf | $78.36 |
| Garapa | $10.00 | 30 yrs | $1.00/sf | $76.36 |
| Mahogany | $12.00 | 30 yrs | $1.00/sf | $78.36 |
| Aluminum | $15.00 | 50 yrs | $1.00/sf | $81.36 |
| Bamboo | $7.00 | 25 yrs | $1.00/sf | $73.36 |
| Thermo-Modified | $9.00 | 30 yrs | $1.00/sf | $75.36 |
Every comparison includes the same geometry, initial framing, railing, stairs, selected extras, labor and permit assumptions. Over 25 years the model adds annual maintenance and replacement decking plus fasteners at the assumed interval, strictly before year 25. Replacement labor, demolition, disposal, framing/railing replacement, tax, delivery, inflation and financing are excluded. This is a partial planning scenario, not a full ownership-cost forecast.
Planning checks
1.Use measured area and actual railing runs.
2.Replace illustrative rates with itemized quotes.
3.Confirm which components, labor and delivery charges each quote includes.