Remodel Levels
Cosmetic refresh ($5,000-$15,000): Paint cabinets. New hardware. New backsplash. New lighting. New faucet. Keep existing layout, cabinets, countertops, and appliances.
Mid-range remodel ($15,000-$50,000): Reface or replace cabinets. New countertops. New backsplash. New appliances. New flooring. New lighting. May keep existing layout.
Major remodel ($50,000-$100,000+): All new everything. New layout (moving walls, plumbing, electrical). Custom cabinets. Premium countertops. High-end appliances. New flooring. Complete transformation.
Key Components & Costs
Cabinets (30-40% of budget): Stock: $100-$300 per linear foot. Semi-custom: $200-$600 per linear foot. Custom: $500-$1,500+ per linear foot. Refacing (new doors on existing boxes): $4,000-$10,000. Painting existing cabinets: $2,000-$5,000.
Countertops (10-15%): Laminate: $10-$40/sq ft. Butcher block: $40-$100/sq ft. Quartz: $50-$150/sq ft. Granite: $50-$200/sq ft. Marble: $75-$250/sq ft.
Appliances (10-15%): Budget package: $2,000-$5,000. Mid-range: $5,000-$10,000. Premium: $10,000-$30,000+.
Flooring (5-10%): Vinyl: $2-$7/sq ft. Tile: $5-$15/sq ft. Hardwood: $6-$15/sq ft.
Backsplash: Subway tile: $5-$15/sq ft. Mosaic: $10-$30/sq ft. Natural stone: $15-$40/sq ft.
Labor (20-35%): Demolition, installation, plumbing, electrical, and finishing. Moving plumbing or electrical: $1,000-$5,000 each.
Layout Options
Galley: Two parallel walls. Efficient work triangle. Great for small spaces.
L-shaped: Two perpendicular walls. Open and versatile. Most common.
U-shaped: Three walls of cabinets. Maximum counter and storage. Can feel closed-in.
Island: Any layout with an added island. Extra prep space, seating, and storage. Requires minimum 36-42 inches of clearance on all sides.
Peninsula: Like an island but attached to a wall or cabinet. Good for smaller kitchens that cannot fit a true island.
Timeline
Cosmetic refresh: 1-2 weeks.
Mid-range remodel: 4-8 weeks.
Major remodel: 8-16 weeks.
Typical timeline: Design and planning: 2-4 weeks. Permits: 1-4 weeks. Demolition: 2-5 days. Rough-in (plumbing, electrical, HVAC): 1-2 weeks. Drywall: 3-5 days. Cabinets: 1-2 days. Countertops: 1-2 weeks (template, fabrication, install). Backsplash: 2-3 days. Flooring: 2-4 days. Appliances and fixtures: 1-2 days. Painting and punch list: 3-5 days.
ROI: Minor kitchen remodel: 72-80% ROI. Major kitchen remodel: 55-65% ROI. The kitchen is the most impactful room for resale value.