Material reference · specification & sourcing
Furring Strips & Shims: Selection and Attachment Planning
Choose furring by the finish assembly, substrate, exposure and required plane. Furring strips and shims serve different roles and should not be substituted without checking the system.
By Lumberama · Updated November 11, 2026 · Editorial standards
Selection at a glance
| Item | Meaning | What to verify |
|---|---|---|
| Interior wall | Finish backing | Manufacturer support schedule |
| Ceiling | Overhead finish support | Connection/load detail |
| Rainscreen | Drainage and ventilation | Cladding system detail |
| Shim | Local alignment | Bearing and compression check |
Walls, ceilings and rainscreens
Interior finish backing needs to match the finish manufacturer’s support spacing and attachment requirements. Ceiling strips must carry the specified dead load through their connections to suitable framing or another designed substrate. Rainscreen battens must also preserve drainage and ventilation paths.
Do not specify one universal spacing for all claddings or ceiling boards. A thinner finish, diagonal layout, concealed fastening system or changed support direction can require different backing. Coordinate details around openings, fixtures and perimeter edges.
Wood, metal and composite choices
Wood strips are readily cut and adjusted, while metal channels and proprietary composite systems have their own profiles, clips and approved fasteners. Compare actual dimensions, straightness, moisture behavior, corrosion compatibility and the manufacturer’s tested assembly.
Shims provide localized adjustment. They do not automatically replace continuous bearing or a structural spacer. Use a shim material and stacking method appropriate to the fastening and load, and account for compression or moisture changes.
Concrete, masonry and framed substrates
Identify the actual substrate before choosing anchors. Concrete, hollow masonry and wood studs require different attachment details. Confirm embedment, edge distance, spacing and allowable loads using the selected anchor documentation and project requirements.
Where wood contacts damp masonry or concrete, determine the required separation or preservative treatment from the assembly. A treated board still needs the correct end-tag specification and compatible fasteners.
Measure quantity and plan interfaces
Lay out supports before ordering finish boards. Include perimeter backing, seams, corners and access panels, and coordinate electrical fixtures rather than cutting through supports without a detail. For material quantity, calculate strip runs from your approved layout and stock lengths.
Specify actual width and thickness, species or approved material, treatment, moisture condition, length schedule and straightness. A nominal strip size does not promise the measured depth needed to align adjacent surfaces.
Check before covering
Verify the plane, connections and dry condition before enclosing the system. Photograph backing and service locations for future maintenance. Keep the product and anchor details with the project record; a finish can hide a connection problem that is difficult to fix afterward.
Build your supplier specification
Enter what is known. Unspecified details stay marked for confirmation. Nothing is submitted until you review and send the sourcing request.
Review specification text
Material: Furring Strips & Shims Application and exposure: To confirm Actual dimensions and lengths: To confirm Grade, faces and selection: To confirm Profile / milling / core: To confirm Moisture or bond classification: To confirm Quantity and unit: To confirm Delivery location, date and access: To confirm
Sources and verification
Reference guidance describes material selection, not a product inspection or engineering approval. Confirm the supplied product, current manufacturer instructions and project requirements. No stock, price, fire rating or service-life guarantee is implied.