How to Install Thermally Modified Wood Decking

Get a step-by-step installation guide tailored to your thermally modified wood project.

Step 1 of 6Application Type

What type of project is this?

Application Type

Residential

Single-family home or personal use

Commercial (Light-to-Moderate)

Light commercial traffic only

Complete Thermally Modified Wood Decking Installation Guide

Thermally Modified Wood is a popular choice for decking applications, valued for its natural beauty and durability. With a Janka hardness of Varies and density of Varies, it offers good performance for residential and commercial projects. Proper installation is essential to maximize the 20+ years expected lifespan.

Janka Hardness

Varies

Density

Varies

Expected Lifespan

20+ years

Origin

North America/Europe

Step 1: Acclimation & Storage

Stack Thermally Modified Wood boards on-site with spacers between every layer for 5-10 days depending on climate. Keep elevated off the ground, covered with a breathable tarp, and open on all sides for airflow.

Step 2: Framing & Substructure

Use pressure-treated joists at maximum 16" on center. Apply joist tape to all joist tops. Ensure at least 18" of clearance underneath for ventilation. Use stainless steel or galvanized joist hangers throughout.

Step 3: Board Layout & Spacing

Plan your layout for visual balance. Side gaps of 3/16" to 1/4" and end gaps of 1/4" are typical. Stagger end joints by at least 2 joists. Place the most attractive boards in high-visibility areas.

Step 4: Pre-Drilling & Fastening

Pre-drill all fastener holes to prevent splitting. Use stainless steel fasteners for best results. Options include face-screwing, hidden clip systems, or face-screwing with wood plugs. Standard carbide-tipped bits work well.

Step 5: Cutting & End-Sealing

Use a carbide-tipped blade for clean cuts. Seal all cut ends immediately with wax-based end grain sealer — at least 2 coats extending 1" onto the board face. This prevents checking and splitting over time.

Step 6: Finishing

Thermally Modified Wood can be finished with penetrating oil to enhance natural color, treated with a UV-protective sealer, or left to weather naturally to a silver-gray patina. Wait 2-4 weeks after installation before applying any finish.

Step 7: Ongoing Maintenance

Sweep weekly and clean 2-3 times per year. If oiled, re-apply annually. Thermally Modified Wood provides 20+ years of durable service with proper installation and maintenance. Never use salt or chemical de-icers.

Required Tools

  • Miter saw with carbide blade
  • Drill with carbide bits
  • Impact driver
  • Level
  • Rubber mallet

Materials Needed

  • Thermally Modified Wood decking boards
  • Stainless steel fasteners
  • Joist tape
  • End grain sealer

Ready to get started? Request a free quote for Thermally Modified Wood decking materials.