How to Install Redwood Decking
Get a step-by-step installation guide tailored to your redwood deck project.
What type of project is this?
Application Type
Residential
Single-family home or personal use
Commercial (Light-Duty)
Light commercial use only
Complete Redwood Decking Installation Guide
Redwood is a popular choice for decking applications, valued for its natural beauty and durability. With a Janka hardness of 450 lbf and density of 28 lbs/ft³, it offers good performance for residential and commercial projects. Proper installation is essential to maximize the 15-25 years expected lifespan.
Janka Hardness
450 lbf
Density
28 lbs/ft³
Expected Lifespan
15-25 years
Origin
California Coast
Step 1: Acclimation & Storage
Stack Redwood boards on-site with spacers between every layer for 5-10 days depending on climate. Keep elevated off the ground, covered with a breathable tarp, and open on all sides for airflow.
Step 2: Framing & Substructure
Use pressure-treated joists at maximum 16" on center. Apply joist tape to all joist tops. Ensure at least 18" of clearance underneath for ventilation. Use stainless steel or galvanized joist hangers throughout.
Step 3: Board Layout & Spacing
Plan your layout for visual balance. Side gaps of 3/16" to 1/4" and end gaps of 1/4" are typical. Stagger end joints by at least 2 joists. Place the most attractive boards in high-visibility areas.
Step 4: Pre-Drilling & Fastening
Pre-drill all fastener holes to prevent splitting. Use stainless steel fasteners for best results. Options include face-screwing, hidden clip systems, or face-screwing with wood plugs. Standard carbide-tipped bits work well.
Step 5: Cutting & End-Sealing
Use a carbide-tipped blade for clean cuts. Seal all cut ends immediately with wax-based end grain sealer — at least 2 coats extending 1" onto the board face. This prevents checking and splitting over time.
Step 6: Finishing
Redwood can be finished with penetrating oil to enhance natural color, treated with a UV-protective sealer, or left to weather naturally to a silver-gray patina. Wait 2-4 weeks after installation before applying any finish.
Step 7: Ongoing Maintenance
Sweep weekly and clean 2-3 times per year. If oiled, re-apply annually. Redwood provides 15-25 years of durable service with proper installation and maintenance. Never use salt or chemical de-icers.
Required Tools
- Miter saw with carbide blade
- Drill with carbide bits
- Impact driver
- Level
- Rubber mallet
Materials Needed
- Redwood decking boards
- Stainless steel fasteners
- Joist tape
- End grain sealer